Projects in this budget
Combined planning budget
£59,708 – £168,025Planning midpoint £113,867 for 3 projects using the National baseline 1.00× model factor and 10% contingency.
This planner uses the same published benchmark layer as the regional comparison tool. Regional factors and contingency are UK Home Costs planning assumptions, not observed local quote averages.
When to use this planner
Use the planner when a programme contains several distinct packages — for example a roof replacement, rewiring and a driveway — and you want one broad budget before collecting detailed quotes. Open the linked cost guide for each line when you need to check the underlying benchmark.
Do not add overlapping scopes twice
Whole-house renovation or new-build benchmarks can already contain work that also appears as separate kitchen, bathroom, flooring, decorating or trade lines. The planner deliberately leaves that judgement with you rather than silently trying to remove overlaps.
Contingency
Contingency is applied after the selected project ranges are combined. It is a user-controlled planning allowance, not a sourced prediction that the project will overrun by that percentage.
Privacy
The planner runs in your browser and does not require an account, email address or phone number. See our Privacy Policy for the wider site policy.