Underfloor heating installation cost per m²
Lower-cost installation where floors are already being constructed£50–£75 / m²
Retrofit floor preparation and build-up can add cost£60–£85 / m²
Pipework and manifolds cost more upfront but suit larger areas£85–£100 / m²
Highest current installation band because retrofit work is more involved£95–£110 / m²
Worked budgets by floor area
These examples are straight-line national calculations before postcode adjustment, floor-condition multipliers or other project-specific extras.
20m² project
40m² project
60m² project
100m² project
Whole-property planning context
What changes the final installation cost?
- Total heated floor area and room layout.
- Electric mats/cables versus wet pipework and manifold systems.
- New-build floor construction versus retrofit work.
- Insulation, screed, overlay boards and floor-height changes.
- Controls, zoning, electrical connections and heating-system integration.
- Existing floor coverings and making good.
Sources
Underfloor Heating Cost: 2026 UK Price Guide & Breakdown
Used for current electric/wet, new-build/renovation cost-per-m² tables and whole-property installation context.
Frequently asked questions
How much does underfloor heating cost per m² in 2026?
Current UK installation benchmarks are £50–£75 per m² for electric new build, £60–£85 for electric renovation, £85–£100 for wet new build and £95–£110 for wet renovation.
How much is 60m² of wet underfloor heating in a renovation?
Using the current £95–£110 per m² wet-retrofit benchmark gives a straight-line national planning range of about £5,700–£6,600 before regional or project-specific adjustments.
Is electric underfloor heating cheaper than wet underfloor heating?
Electric systems are generally cheaper to install. Wet systems cost more upfront but are often preferred for larger areas or whole-house systems, particularly where they are paired with a suitable low-temperature heat source.
Why does retrofit underfloor heating cost more?
Existing floors may need lifting, insulation improvements, screed or overlay systems, door and threshold adjustments, and extra making good. Those constraints are much smaller when the floor build-up is planned from the start.